TS-Topographic Survey, ST-Soil Test, A-Architectural Plan, D-Detail Design, E/M-Electro-Mechanical Design, E/T-Estimate & Tendering, S-Supervision
Sl. |
Name of Project with Department |
Scope of Service |
Year of Computation. |
Consultancy Fees |
Remark |
1 |
Consultancy
Services for owner Engineering for Construction of Bibiyana-
III 400MW Combined Cycle
Power Plant Under
Bangladesh Power Development Board (BPDB). Funded by JICA project cost Tk
3500.crore |
Design,
construction supervision, of steam turbine gas turbine, Boiler House, Water
cooler House, WAREHOUSE WORK Shop (still Frame ) &
Rcc, Structure Plant Rcc
House) jetty face Building staff quarter, Internal Road, Water Treatment Land
Development etc. |
August
2008 to December
2012 |
176.39
Lakh |
JV
of Minconsult, Malaysia |
2 |
Consultancy
Services for owner Engineering for Construction of 150 MW Peaking Power Plant Complex
at Siragonj, Funded by Asian Development Bank (ADB)
Under Bangladesh Power Development Board (BPDB). |
August
2008 to December
2012 |
172.76
Lakh |
JV
of Minconsult, Malaysia |
|
3 |
Consultancy
Services for owner Engineering for Construction of 150 MW Peaking Power Plant Complex at Khulna, Funded by Asian
Development Bank (ADB) Under Bangladesh Power Development Board (BPDB). |
January
2012 to December
2014 |
172.76
Lakh |
Jv of Minconsult, Malaysia |
|
4 |
Consultancy
Services for owner Engineering for Construction of up- Gradation of 150 MW PPPP up to 225MW Combined Cycle Power Plant at Sirajgonj Under NWPGCL / BPDB. |
March
2013 to December
2016 |
235.09
Lakh |
Jv of Minconsult, Malaysia |
|
5 |
Consultancy
Services for owner Engineering for Construction of up- Gradation of 150 MW PPPP up to 225MW Combined Cycle Power Plant Under NWPGCL / BPDB. Funded by
ADB. |
April
2015 to September 2017 |
182.36
Lakh |
Jv of Minconsult, Malaysia |
|
6 |
Consultancy
Services for owner Engineering for Construction of 225 MW Combined Cycle
Power Plant (2nd unit) at Sirajgonj
Under North West Power Gower Co. Ltd. (NWPGCL). |
March
2016 to December 2018 |
|
Jv of Minconsult, Malaysia |
|
7 |
Consultancy
Services for owner Engineering for Construction of 225 MW Combined Cycle
Power Plant (3rd unit) at Sirajgonj
Under North West Power Gower Co. Ltd. (NWPGCL). |
February
2016 to December 2019 |
|
NOFEAR,UKRAINE |
|
8 |
Consultancy
Services for Construction of Land- Development & Other Infrastructure for
350 MW Coal Power Plant wander Rural Power Co. Ltd. (RPCL) |
June
2016 to June
2018 |
|
NOFEAR,UKRAINE |
GT + GTG + HRSG + ST+ STG, river water intake , WT plant + 400kV Switch yard , 400kV & 230kV EHV underground Cable , Including administrative and housing complex , medical Center with equipment , rest house, officers club, dormitory house. * Open Cycle, Combined Cycle, Gass Turnibe Steam- Turbine, Boiler, Cheminoy, Pile foundation for heavy- Power Plant Equipment, Erection, Testing, Commissioning, Administrative Building, Staff quarter, Dormitory, overhead water Tank. Water Treatment Plant. Internal Road, RCC Jetty on Kushira- River for unloading of heave Power Plant Equipment, Pump, Motor, Pipping work, IT- Work etc. * Design Approval, Procurement Services. * Construction Supervision. * Project Management, Meeting with Client, Monitoring. .
More..A Simple Cycle 150MW Gas Turbine Power Plant was installed in Sirajganj district, Bangladesh. To increase the generative capacity of this plant, North West Power Generation Company Ltd, (NWPGCL) intends to convert this gas turbine power plant to a 225MW Combined Cycle Power Station.
More..Provide Consulting services for Preliminary Design, Engineering, preparation of tender document, bid evaluation, approval of design, drawing, supervision of construction including Land Development, Internal Road etc, installation, testing & commissioning, handing over plant including issuance of Provisional Acceptance Certificate (PAC) of the peaking power plants.
More..150MW Gas Turbine Generating Unit, 132KV Switchyard (Including Power Evacuation to the Bangladesh National Grid).
Provide Consulting services for Preliminary Design, Engineering, preparation of tender document, bid evaluation, approval of design, drawing, supervision of construction including Land Development, Internal Road etc, installation, testing & commissioning, handing over plant including issuance of Provisional Acceptance Certificate (PAC) of the peaking power plants.